Color & Style Home Finishes has designers on staff. Not
salespeople with a catalog — people who draw kitchens and bathrooms for a living and have been
opening the walls of Dayton houses since 1965.
Design is where a renovation is won or lost. Every expensive decision — whether the wall comes
out, where the plumbing goes, whether the island fits — is cheap on paper and ruinous once the
tile is down.
Light Changes Color, and Nothing Else Comes Close
The most common and most expensive mistake in a remodel is choosing a finish under the wrong
light.
Showrooms are lit brightly and evenly, usually with cool bulbs. Your kitchen is not. It has one
window facing a particular direction, some undercabinet lighting, and a ceiling fixture with
whatever bulbs happen to be in it. A gray that reads cool and crisp under showroom light can turn
distinctly lavender or green in a north-facing room, and a warm white cabinet can go yellow under
3000K bulbs.
Two finishes that look identical side by side under one light can look nothing alike under
another. That is not a matter of taste; it is how the pigments respond to different parts of the
spectrum.
So: take samples home. Look at them in the actual room, on the actual wall, at the times
of day you actually use it — morning, evening, lamps on. Look at the cabinet door
against the counter sample against the floor sample, together, in that room. It costs you a few days
and it is the cheapest insurance in the entire project.
It is also the single best argument for buying from a showroom rather than a photograph. We can
put the actual samples in your hand and you can go and stand in your own kitchen with them.
The Order Decisions Get Made In
There is a sequence, and getting it backwards is how people end up compromising on the thing they
cared most about.
Start with the constraint you cannot move. Usually that is the flooring —
because it runs through the most rooms, it is the largest surface, and it is the hardest to change
later. If the floor continues into adjoining rooms, it constrains everything.
Then cabinets, because they are the biggest visual mass in a kitchen and have the
longest lead time.
Then countertops against the cabinets.
Then backsplash and paint, which are the easiest to match to everything else and
have the most options. Choosing paint first and forcing the cabinets to match it is doing the whole
thing in reverse.
Then fittings and hardware — the smallest commitment and the easiest to
change your mind about.
One thing to decide early rather than late: the one surface that carries the room.
Pick it deliberately. If the counter is a dramatic stone, the backsplash should be quiet. If the
backsplash is the feature, the counter should not compete. Rooms that fight themselves are almost
always rooms where two things were each chosen to be the star.
Working With What the House Already Has
Every house here has fixed points that a design has to accept.
Plumbing stacks and vents are the expensive ones. Moving a sink a few feet along
the same wall is straightforward; moving it to an island in a house on a slab is a different
project entirely.
Window heights decide where wall cabinets can go and whether a run can be
continuous.
Door swings and traffic paths decide whether an island works or just makes the
kitchen annoying. Thirty-six inches of clearance is workable; forty-two is comfortable; less than
that and you will feel it every day.
Ceiling height decides whether cabinets go to the ceiling, stop short, or need a
soffit removed — and removing a soffit is worth checking before you assume it, because plenty
of them contain ductwork or wiring.
Dayton’s housing stock has patterns worth knowing. Post-war ranches in Kettering and Huber
Heights tend to have compact kitchens with load-bearing walls between kitchen and dining, so
“opening it up” is a structural conversation before it is a design one. Older Oakwood and Dayton
View houses have more generous ceilings and original trim that new cabinetry has to be detailed
against rather than ignore. And a great many 1950s and 60s houses have original oak under the
carpet, which changes the flooring decision completely — see
hardwood refinishing.
Where to Spend and Where Not To
Every project has a budget that is smaller than the ambition. Design is largely the work of
deciding where the money goes.
Worth spending on: cabinet boxes and drawer hardware, because they are what
actually wears out and are the hardest thing to change later. Flooring, for the same reason.
Anything structural or behind a wall.
Worth less than people think: the top of the cabinet line when the tier below is
the same box with a different door. Premium stone on surfaces nobody looks at — a butler’s
pantry or a laundry does not need what the island has. And features you are buying for a resale
you are not planning.
Easy to change later: hardware, light fittings, paint, faucets. If the budget is
tight, these are the honest places to economize, because upgrading them in three years is a Saturday
rather than a project.
The Most Valuable Thing a Designer Does Is Say No
Anyone can add. The value is in knowing what to leave out.
A designer earns their keep when they tell you the pattern you love will fight the floor you have
already chosen, or that the island you want leaves you 30 inches to the range, or that the trend you
have seen everywhere for two years is going to date and you should be the one who decides that
consciously.
We would rather have that conversation over samples on a table than after the product is
delivered.
What Design Costs
Design comes with the project. We are a showroom that installs, not a design studio that bills by
the hour — you are buying materials and installation, and the design work that makes those
decisions good is part of it.
What that buys you: measured selections, finishes coordinated against each other, and someone
accountable for the fact that they work together in the actual room.
If you already have an architect or an independent designer, that is genuinely fine. We supply and
install to their specification, and we will flag a conflict we can see rather than build it.
Kitchen Design
Layout first, finish second. Where the sink, range and refrigerator sit relative to one another
decides whether a kitchen is pleasant to cook in, and no amount of beautiful material rescues a bad
working triangle. Then storage — drawers rather than lower doors for pans, a genuinely usable
corner, and somewhere for the appliances that live on the counter.
See kitchen remodeling and
cabinets.
Bathroom Design
Bathrooms are small, which makes every decision louder and every mistake more expensive per square
foot. The questions that matter: tub or no tub (and be honest about whether anyone uses it), whether
a curbless shower is worth the floor structure it needs, where the light comes from relative to the
mirror, and storage that does not eat the floor area.
Waterproofing is a design decision as much as a construction one — see
bathroom remodeling and waterproofing.
Design FAQ
Do you charge for design?
No. Design comes with the project when we supply and install the materials.
What should I bring to a first appointment?
Rough measurements, photographs of the room including the light at different times of day, and
anything you have saved that you like. If you have a floor plan, bring it. If not, we will
measure.
Can I take samples home?
Yes, and you should. Look at them in the room, at the times you use it, together rather than one
at a time.
Do I need drawings for a small remodel?
For a straight cabinet or counter replacement, usually not. Once you are moving walls, plumbing or
windows, drawings stop being optional.
Can I bring my own designer or architect?
Yes. We supply and install to their specification and will raise anything we think will not work
before it is ordered.
How long does design take?
Selections usually take two to four weeks of back and forth, mostly waiting on you to live with
samples. Product lead times run behind that, and cabinets are usually the long pole.
What is the most common mistake you see?
Choosing finishes under the wrong light, and choosing them one at a time instead of together.
Do I need to know what I want before I come in?
No. Most people arrive with photographs they like and no idea why they like them, and working that out is the job.
How many samples should I take home?
Enough to see them together — the floor, the cabinet door and the counter at once. Judging any of them alone is how mismatches happen.
Can you help if I only want one room done?
Yes. A single bathroom or a floor replacement gets the same selection help as a whole-house project.
What if my partner and I disagree?
Extremely common, and usually productive. It is generally cheaper to have the argument over samples on a table than after the cabinets arrive.
Will you tell me if you think something is a mistake?
Yes. That is most of what the job is worth. We would rather lose the upsell than build something you stop liking in two years.
Do you do 3D renderings?
We do elevations and layouts for kitchen work so you can see the cabinet run before it is ordered. Photorealistic rendering is not what we are, and it tends to sell a feeling rather than test a plan.
Should I pick paint first?
Last, almost always. Paint comes in every color there is, so match it to the cabinets and counters rather than forcing them to match a paint chip.
How do I stop the design dating?
Keep the expensive, hard-to-change things fairly quiet — cabinets, counters, floor — and put the personality into hardware, paint and fittings that are cheap to change in five years.
Come and Talk It Through
Call 937-253-1131 or
book a showroom visit. Bring photographs and rough dimensions and we can
get a long way in one appointment.
3609 Linden Ave, Dayton, OH 45410, Monday to Friday 9am to 6pm. See also
remodeling and the project
gallery.
What Design Decisions Actually Look Like
Four rooms where the design decision, not the product, is what makes the room work — working with what the house already had, choosing where to spend, and knowing which one surface should carry the room.



