Color & Style Home Finishes is a full kitchen remodeler in Dayton, Ohio. We design the room, supply everything that goes in it, and install it — cabinetry, countertops, tile, flooring, lighting, hardware, and the layout changes that make all of it work. We have done this from the same building at 3609 Linden Avenue since 1965.
Some clients come to us for a refresh: new doors, new counters, a floor that finally runs properly through to the hall. Others arrive with a wall they want gone, plumbing they want moved, and a room they want rebuilt from the studs. We do both. Last month we finished a kitchen north of $100,000.
Everything you will choose is in one room, in the same light, at the same time — cabinetry, countertops, tile, flooring, hardware and lighting, together and against each other. Not carried across town in a paper bag hoping it still works on Tuesday.
Sixty years of buying materials means our clients reach specialty door styles, custom stain and paint matching, inset and full-overlay cabinetry, stone selected slab by slab, and tile from mills that sell only through independents. When somebody wants something that is not in anyone’s catalog, we can usually have it made.




These are the manufacturers we work with most often. It is worth browsing them before your kitchen consultation so you arrive with a direction — click any name to explore what they offer.
Wolf Home Products builds cabinetry from clean slab doors to traditional raised panel, across a range of styles, colors and price points, plus countertop surfaces from quartz and solid surface through to natural granite.
Daltile is the world’s leading manufacturer of ceramic tile, and also produces porcelain, wood-look, marble, mosaic and natural stone.
Florida Tile makes finding the right tile straightforward — searchable by collection, color, look, size, shape, application, type and finish.
Schluter Systems makes the parts of a tile installation you never see: the waterproofing, movement joints and edge profiles that decide whether tile lasts five years or thirty.
We carry considerably more than these four. If you have seen something elsewhere, bring us a photo — we can usually source it or better it.
Before we buy a single item or swing the first hammer, the layout gets settled on paper. Plans and elevations, and an honest look at what the space can and cannot do.
This is where the expensive decisions live. Where the work triangle actually wants to be. Whether the island fits, or whether it will leave you turning sideways to open the dishwasher. What the wall you want removed is holding up, and what it will take to remove it properly. Where plumbing and electrical have to travel, because distance is money in both.
Settling all of that first is the difference between a project that runs to schedule and one that stops for three weeks in the middle.
01
02
03
*1/2 of the project cost will be collected prior to starting the project. The balance will be collected when the project is completed.
A kitchen takes more punishment than any other room in the house, and most of what shortens its life is avoidable.
Quartz wants soap and water, not an abrasive. Natural stone wants sealing on a schedule that depends on the stone, and we will tell you which yours is. Painted cabinetry wants the steam from a kettle directed away from the door above it. Wood floors in a kitchen want mats where water lands, not where it looks tidy.
We go through all of this at the walkthrough, and we are still here afterwards — same address, same phone number — when a question comes up in year six.
We also build kitchens with a lighter footprint when clients want one — low-VOC finishes, responsibly sourced wood, cabinetry from manufacturers with genuine environmental programs rather than a logo, and water-saving fixtures that do not feel like a compromise.
If your project is only cabinets, or only a floor, we will gladly do that too. But you do not need to hire three companies and hope they agree with one another.
We publish ranges because it is always the first question and guessing helps nobody. These are complete projects — labor, materials and finishes — in the Miami Valley market.
Refresh: roughly $15,000 to $30,000. The existing layout stays. New cabinetry or refacing, new countertops, backsplash, flooring, lighting and hardware. This is the project most kitchens actually need.
Full renovation: roughly $40,000 to $80,000. Layout changes, a wall removed, plumbing and electrical relocated, semi-custom or custom cabinetry, stone countertops, and appliances integrated rather than dropped in.
Custom and high-end: $100,000 and up. Fully custom cabinetry made for the room by the cabinetmakers we work with, slab counters with matching backsplashes, specialty finishes, structural work, and an appliance package specified around the way you actually cook. These are real projects and we build them.
Four things move your number: the condition of what is behind the walls, how far plumbing and electrical have to travel, whether cabinetry is stock, semi-custom or custom, and the countertop material. Nothing else comes close. We walk you through all four before you commit to anything.
Most remodelers build first and shop second. They send you out to a tile store, a cabinet dealer and a flooring retailer, then assemble whatever you bring back. Selections become homework. Lead times become surprises. A discontinued product becomes a three-week delay you hear about on a Friday.
Sixty years of buying materials means we know what exists, what it costs, what is genuinely in stock, and what will actually arrive on the date a manufacturer promises. On a kitchen, material availability sets your schedule more than labor does — cabinetry lead time is almost always the longest single item, which is why we settle selections early rather than late.
If what you want is the lowest possible price on whatever happens to be in stock, with no variety and no help choosing, a box store may genuinely suit you better, and we will say so. But a kitchen that looks designed for your house rather than assembled from a display is a different kind of purchase, and it is the one this company was built for.
Most of the useful knowledge in this business is local, because most of the surprises are.
Pre-war Dayton and Oakwood. Plaster over lath, an original subfloor that is rarely flat, and kitchens laid out for a household with a pantry and no dishwasher. They renovate beautifully, but the layout nearly always wants to change and the wall you want gone is often load-bearing.
1950s and 60s Kettering, Centerville and Huber Heights ranches. Small galley kitchens closed off from the living space. Opening the wall between kitchen and dining is the highest-return change available in these houses, and it is usually more achievable than owners expect.
1980s and 90s Beavercreek, Washington Township and Springboro. Sound structure, workable layouts, builder-grade everything. These are refresh projects, and they transform dramatically for the money.
2000s and newer. Usually a question of finish level rather than layout — island expansions, cabinetry taken to the ceiling, and stone replacing the original laminate.
We have opened all four. That is why our estimates hold.
1. Conversation. Come to the showroom, or we come to you. We want to know what is wrong with the room now, not only what you want it to look like.
2. Design and layout. Plans and elevations. Wall removals, plumbing moves and appliance decisions settled here, because they are the expensive things to change later.
3. Selections. Cabinetry, counters, tile, flooring, hardware and lighting, chosen together. Samples go home with you at no charge.
4. Proposal. A written scope and price covering labor and materials, with allowances stated plainly so you can see exactly where the number can move.
5. Build. Demolition, rough-in, cabinetry, counters, tile, finish. One point of contact who knows the status of every item on order.
6. Walkthrough. We go through it with you and fix the list. Then we are still here, the way we have been since 1965.
The most valuable thing that happens in our showroom is not the selling. It is somebody telling you that the layout you drew will not work, that the finish you love will show every crumb, or that the money you are about to spend on one upgrade would do more somewhere else in the room.
We also tell people when to stop. Not every kitchen needs to be gutted. Sometimes the right answer is new doors, new counters and a floor that runs properly through to the hall, and the client keeps forty thousand dollars. We have given that advice many times. It is usually why those clients come back for the bathroom.
The showroom is in Dayton and we remodel kitchens throughout Montgomery, Greene, Miami, Warren and Preble counties — Kettering, Oakwood, Centerville, Beavercreek, Springboro, Washington Township, Troy, Tipp City, Vandalia, Huber Heights, Miamisburg, Bellbrook, Xenia, Fairborn and the communities around them. See the full list of areas we serve.
Full renovations, and it is the largest part of what we do — design, materials and installation, including layout changes, wall removal and relocated plumbing and electrical. We will also sell you just the cabinets if that is genuinely all you need.
A refresh keeping the existing layout typically runs three to five weeks on site. A full renovation with layout changes usually runs eight to twelve weeks from demolition to walkthrough. Cabinetry lead time is normally the longest single item, which is why we settle selections early. There is a fuller schedule here.
Most complete kitchens in this market land between $15,000 and $80,000 depending on whether the layout changes and how far up the material ladder you go. Custom projects run past $100,000.
Yes. Work that moves plumbing or electrical is coordinated with licensed trades and permitted where required. You do not manage that — we do.
Often, yes. If the boxes are sound, refacing or new doors and drawer fronts with new counters and hardware gets you most of the visual change for a fraction of the cost. We will tell you honestly whether your boxes are worth keeping.
Usually. Storage depth, lighting, sight lines and where the appliances sit do more than square footage does — we cover the specifics in making a small kitchen bigger.
Yes. We supply builders, remodelers, designers and investors across the Miami Valley. If you want the materials and the design counsel without our installation, that is a perfectly normal way to work with us — see builder supply.
Yes — see kitchen remodel financing. We will also explain plainly how a promotional offer works before you sign it.
Almost nobody does. You will be without a kitchen sink and cooktop for a stretch, so most people set up a temporary kitchen elsewhere in the house with the fridge, a microwave and a kettle.
Usually two to three weeks — from the day the old counters come out to the day the new ones are installed and the plumber reconnects. The wait is countertop fabrication, which cannot start until the cabinets are set.
Cabinetry, most of the time. After that it is anything that moves plumbing or takes down a wall, because that turns a finish project into a construction one.
No. We source cabinetry — stock, semi-custom and fully custom — from the cabinet makers we work with, and our own crews install it. Anyone claiming to both manufacture and install at this scale is usually doing neither well.
Semi-custom covers most kitchens: standard boxes, a wide choice of doors and finishes, shorter lead time. Fully custom earns its money when the room is an awkward shape, the ceilings are unusual, or you need something built to a dimension that does not exist in a catalogue.
Cabinets are almost always the long pole. Build the schedule around their lead time and everything else fits around it.
Generally the flooring runs under the cabinets on a full remodel, so it goes first. If you are keeping the cabinets, it goes around them and the toe kick covers the edge.
Often, but find out first whether it is load-bearing. A great many post-war Dayton ranches have a bearing wall exactly there, which makes it a structural job with a beam rather than a demolition afternoon.
No. An island needs about 42 inches of clearance around it to be pleasant and 36 to be usable. Below that it makes the kitchen worse, and a peninsula or a bigger run of counter is the better answer.
Tile runs $9 to $16 a square foot installed, more for intricate layouts or large format. A full-height slab splash in the same stone as the counter is a different budget entirely.
Sometimes, if the line is still current. Finishes drift between production runs, so an exact match on older cabinetry is rare — often the better answer is a deliberate contrast on the new run, such as a different island color.
We set them in place as part of the installation and coordinate the cutouts and clearances. Gas and electrical connections are done by the licensed trades on the job.
Two more ways into a kitchen project: tile installation for backsplashes and floors, and cabinet refacing when the boxes are sound and only the doors need to change.
Working with a designer is included when we do the project — see kitchen and bathroom design services.
See all flooring and remodeling guides.
See kitchens we have actually built — 60-plus photographs of our own work, not showroom stock.
See backsplash installation for the tile decision specifically.